Testbed
The physical testbed
HoneyMesh runs on real, affordable hardware. The testbed is deliberately small, isolated and auditable.
The components
- Decoy nodes
- Two Raspberry Pi 5 boards, each running Cowrie and the HoneyMesh agent.
- Isolation
- A managed switch with a dedicated decoy network segment that has no outbound access.
- Control plane
- Hosted on Amazon Web Services (AWS) since 26 November 2026, with no public inbound access; nodes are reached over an encrypted WireGuard-based overlay.
- Laboratory
- A three-node container laboratory for safe execution testing. It does not count towards O1.
Operational truthfulness
After a remediation on 27 November 2026, both Cowrie sensors are reported HEALTHY by independent probes, and a controlled stop-and-start test was detected within seconds. This is engineering validation, not research evidence.
Verified engineering milestones
- 24 Aug 2026Phase 0 baseline frozen.
- 20 Nov 2026Pre-registered telemetry run on one physical node: 30 of 30 sessions captured all mandatory events. One controlled run, descriptive only.
- 21 Nov 2026Full adaptation lifecycle demonstrated in the container laboratory: real decoy changes, read-back, rollback and refusal of stale approvals.
- 23 Nov 2026Physical node preparation executed and accepted; no profile applied; commands disabled.
- 24 Nov 2026Control plane for the physical command path deployed; tested offline only; zero physical commands.
- 26 Nov 2026Control plane moved to AWS; both physical nodes verified for Cowrie telemetry.
- 27 Nov 2026Truthful sensor health deployed; both Cowrie sensors operational in a focused engineering acceptance.
Hardware photography
Approved photographs of the hardware will appear here. Until then this page shows a labelled conceptual illustration, not a photograph.